|
*If HTML and/or UBB Code are enabled, this means you can use HTML and/or UBB Code in your message.
[This message has been edited by Gothic Builder (edited 12-16-98).]
Gothic Builder Well to answer a few questions! The stone I'm useing is called #2 rifraft (limestone) The size is from a softball to that of a basketball or just a little bigger. Cost is 240.00 Dollars for a 26ton truck load. (cost may very in other parts of the country) But very eazy to work with that is if my back holds out. So good luck if your building your dream. But it takes time 10 years maybe. I am building in N.W.Tenn on a small hill overlooking a river botton to the north.
Powered by:
Ultimate Bulletin Board (UltimateBB), Version 5.40
© Infopop Corporation (formerly Madrona Park, Inc.), 1998-1999.